Case Studies

Protection and Arc Flash Study

Oil & Gas Terminal / UK

Full protection discrimination, Arc Flash studies and protection revision for one of the main UK Oil & Gas Terminals.

Arc Flash Safety was contracted to carry out a detailed arc flash analysis and assessment of the existing protection on the entire electrical system of a major Oil and Gas Terminal. In addition, load flow and short-circuit studies were carried out to verify the system behaviour under various operating conditions.

Several switchboards were identified with high arc flash incident energy levels, and revised protection settings to mitigate these energies were proposed, together with the updated Time Current Characteristic (TCC) drawings and updated Master Protection Schedule.

See also

Concept studies - offshore charging point

Offshore / Maritime
read more

Motor Starting Studies - Oil Platform

Oil & Gas Operator / North Sea
read more

Motor Starting Studies - FPSO

Oil & Gas Operator / North Sea
read more

Temporary Generation assessment

Oil & Gas Operator / North Sea
read more

Platform Earthing

Oil & Gas Operator / North Sea
read more